|

The Grab-Hook
is now installed. Continue to place Grab-Hooks as
needed, alternating the direction of the hooked end for
each j-hook. *Note for installation with two
horizontals, the two smaller loops are attached to the
innermost rebar and the bigger loop hooking both rebar
pieces.
<<back |