Insert the
straight end of the j-hook through the two loops of the
Grab-Hook. Bring the j-hook up completely through
the Grab-Hook. Grab-Hook assembly is ready for the
foundation.
The Grab-Hook
is now installed. Continue to place Grab-Hooks as
needed, alternating the direction of the hooked end for
each j-hook. *Note for installation with two
horizontals, the two smaller loops are attached to the
innermost rebar and the bigger loop hooking both rebar
pieces.
Snap the two
smaller loops with a "side-tap" of a hammer to the center
bar. Installation is now complete. Continue to
place Grab-Hooks as needed, alternating the direction of
the hooked end for each j-hook.